Echo ES-210 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Ferramentas Echo ES-210. Echo ES-210 User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
SHRED 'N' VAC
®
Operator's Manual
MODEL ES-210
X753002370
12/04
X7531135400
WARNING DANGER
Read rules for safe operation and all instructions carefully. ECHO provides this
Operator’s Manual, which must be read and understood for proper and safe operation.
Vista de página 0
1 2 3 4 5 6 ... 23 24

Resumo do Conteúdo

Página 1 - SHRED 'N' VAC

SHRED 'N' VAC®Operator's ManualMODEL ES-210X75300237012/04X7531135400WARNING DANGERRead rules for safe operation and all instructio

Página 2 - OPERATOR’S MANUAL

10DE5. Align grooves in discharge elbow with pegs on blower, and slideelbow (D) on to blower. Turn elbow counterclockwise to lock inplace. Elbow mus

Página 3 - 71 Category II

11SHRED 'N' VAC®OPERATOR'S MANUALoitaR1:05-xiMliOotleuF.S.UCIRTEMSAGLIOSAGLIOsnollaG.zo.lFretiL.cc1256.22.531480208061004IMPORTANTSpill

Página 4 - SAFETY I NSTRUCTIONS

12OPERATIONSTARTING COLD ENGINE1. Stop SwitchMove stop switch button (A) away from the STOP position.2. Throttle Position LeverMove throttle position

Página 5 - OPERATION/EXTREME CONDITIONS

13SHRED 'N' VAC®OPERATOR'S MANUALSTARTING WARM ENGINEThe starting procedure is the same as Cold Start except DO NOT closethe choke.1. S

Página 6 - EMISSION CONTROL

14BLOWER OPERATIONWARNING DANGERAlways wear safety glasses, hearing protection and a face filtermask or serious personal injury may result.Do not

Página 7 - DESCRIPTION

15SHRED 'N' VAC®OPERATOR'S MANUALSHRED ‘N’ VAC® OPERATIONWARNING DANGERFlying debris hazard. Never operate unit as a vacuum unless

Página 8 - SPECIFICATIONS

16MAINTENANCEYour ECHO blower is designed to provide many hours of trouble free service. Regular scheduled maintenance will helpyour blower achieve th

Página 9 - /SHREDDING APPLICATION

17SHRED 'N' VAC®OPERATOR'S MANUALAIR FILTERLevel 1.Tools required: 25-50 mm (1-2 in.) cleaning brush.Parts required: 90008 REPOWERTM Ai

Página 10

180.65 mm(0.026 in.)SPARK PLUGLevel 2.Tools required: T-Wrench, Feeler gaugeParts Required: REPOWERTM Tune-Up Kit P/N 900741. Remove spark plug and ch

Página 11 - PRE-OPERATION

19SHRED 'N' VAC®OPERATOR'S MANUALEXHAUST SYSTEMSpark Arrestor ScreenLevel 2.Tools required: Cross Head Screwdriver, 3 mm Hex Wrench, so

Página 12 - COLD ENGINE

2TABLE OF CONTENTSIntroduction ... 2- The Operator's Manual ...

Página 13 - WARM ENGINE

20Cylinder Exhaust PortLevel 3.IMPORTANTThe cylinder exhaust port must be inspected and cleaned of excesscarbon every 3 months or 90 hours of operatio

Página 14 - OPERATION

21SHRED 'N' VAC®OPERATOR'S MANUALABCARBURETOR ADJUSTMENTEngine Break-InNew engines must be operated a minimum duration of two tanks of

Página 15 - 'N' VAC

22WARNING DANGERFuel vapors are extremely flammable and may cause fire and/or explosion. Never test for ignition spark by ground-ing spark plug n

Página 16 - INTERVALS

23SHRED 'N' VAC®OPERATOR'S MANUALSTORAGEWARNING DANGERDuring operation the muffler or catalytic muffler and surrounding cover become

Página 17

ECHO, INCORPORATED400 Oakwood RoadLake Zurich, IL 60047-1564www.echo-usa.comSERVICING INFORMATIONPARTSGenuine ECHO Parts and ECHO REPOWER™ Parts and

Página 18 - SYSTEM CLEANING

3SHRED 'N' VAC®OPERATOR'S MANUALIMPORTANTThe enclosed message providesinformation necessary for the protectionof the unit.NOTEThis encl

Página 19

4WARNING DANGERSHRED ‘N’ VAC® users risk injury to themselves and others if the SHRED ‘N’ VAC® is used improperly and/orsafety precautions are not

Página 20 - WARNING DANGER

5SHRED 'N' VAC®OPERATOR'S MANUALEQUIPMENT• Check unit for loose/missing nuts, bolts and screws. Tightenand/or replace as needed.• Inspe

Página 21 - ADJUSTMENT

6IMPORTANT ENGINE INFORMATIONENGINE FAMILY: 5EHXS.0214KG DISPLACEMENT: 21.2 ccEMISSION COMPLIANCE PERIOD: 300 HoursTHIS ENGINE MEETS U.S. EPA PH2 AN

Página 22 - TROUBLESHOOTING

7SHRED 'N' VAC®OPERATOR'S MANUAL1235678910111241314DESCRIPTIONCONTENTS__ 1 - Power Head__ 1 - Straight Pipe__ 1 - Pipe with Nozzle__ 1

Página 23

813. DEBRIS BAG - Collects shredded material.14. BLOWER PIPES - Twist lock design.15. PRIMER BULB - Pumping primer bulb before starting engine draws f

Página 24 - OR REPLACEMENT MANUALS

9SHRED 'N' VAC®OPERATOR'S MANUALAASSEMBLYRequired Tools: ScrewdriverWARNING DANGERNever perform maintenance or assembly procedures

Comentários a estes Manuais

Sem comentários